hospital waste management Incinerator system

Incinerator (hospital waste management system) is a turn-key project which will comprise a  hospital grade incinerator, allied accessories and operation for proper disposal of hospital General medical waste (plastics, gloves and papers) and Infectious waste (blood-soaked bandages, sharps waste, surgical waste, human or body parts, cultures, and swabs).the unit should be of high performance to operated continuously for at-least 12 hours daily. Energy/Fuel Source for incinerator will be Natural Gas based on Pyrolysis with smokeless emission, for ensuring the clean environment system should strictly comply with Environmental Protection Agency (EPA) Pakistan emission standards.   Technical Specifications:   1. Burning Capacity i. Incinerator should be capable to burn waste @ 100 kg / hr in single loading. 2. Construction i.   Packaged type skid mounted dual chamber construction ii. Stainless steel or Mild steel outer with thickness 5mm or more, sheet should be painted with heat resistant and anti-corrosive paint. iii. Internal surface of incinerator should be line with non– cracking refractory bricks made of ceramics or concrete to withstand the temperature of 1400 oC, furthermore bricks must be backed by thermal insulation and have thickness in between 220C250 mm. iv. There should be thermal insulation of high performance calcium silicate (Density 230Kg.m-3)to withstand high temperature with flame spread/smoke index not more than 1. v. Refractory and thermal insulation must be designed in robust way so that outer temperature on sheet does not rise above 55– 60 oC even after continuous operation of 12 hours. 3. Primary Chamber i. […]

hospital waste management Incinerator system

Incinerator (hospital waste management system) is a turn-key project which will comprise a  hospital grade incinerator, allied accessories and operation for proper disposal of hospital General medical waste (plastics, gloves and papers) and Infectious waste (blood-soaked bandages, sharps waste, surgical waste, human or body parts, cultures, and swabs).the unit should be of high performance to operated continuously for at-least 12 hours daily. Energy/Fuel Source for incinerator will be Natural Gas based on Pyrolysis with smokeless emission, for ensuring the clean environment system should strictly comply with Environmental Protection Agency (EPA) Pakistan emission standards.   Technical Specifications:   1. Burning Capacity i. Incinerator should be capable to burn waste @ 100 kg / hr in single loading. 2. Construction i.   Packaged type skid mounted dual chamber construction ii. Stainless steel or Mild steel outer with thickness 5mm or more, sheet should be painted with heat resistant and anti-corrosive paint. iii. Internal surface of incinerator should be line with non– cracking refractory bricks made of ceramics or concrete to withstand the temperature of 1400 oC, furthermore bricks must be backed by thermal insulation and have thickness in between 220C250 mm. iv. There should be thermal insulation of high performance calcium silicate (Density 230Kg.m-3)to withstand high temperature with flame spread/smoke index not more than 1. v. Refractory and thermal insulation must be designed in robust way so that outer temperature on sheet does not rise above 55– 60 oC even after continuous operation of 12 hours. 3. Primary Chamber i. […]

Particular Spec for Incinerator

The burner shall have all the necessary controls e.g.Solenoid valves, ignition controls, photo electric cell fuel safety controls, low pressure fuel supply cut-off etc.Weight (kg), please indicate:Secondary ChamberGas Retention Time – 2 SecondsDiesel/LPG/LNG, please indicatePower Supply for Control Box- 220V-240V 50Hz single phaseBurn Rate 250kg/h minimumWeight (kg) please indicate:Secondary ChamberGas Retention Time 2 SecondsFuel Diesel/LPG/LNG, please indicatePower Supply for Control Box 220V-240V 50Hz single phaseMinimum operating temperature 920 °C, please indicate Lot 4 C High Temperature Waste IncineratorItem 13 HTW Incinerator model D Burn Rate – 150kg/hour minimum Weight (kg), please indicate: Secondary Chamber Gas Retention Time 2 Seconds Fuel Diesel/LPG/LNG, please indicate The incinerator shall operate in an automatic manner with all the necessary controls.  These controls are to include safety elements such as flame failure unit, pilot lamps, fuses, starters, overload contactors, ON and OFF switches for burners and fans, combustion chamber temperature indicators for primary and secondary chambers etc. i)  Electric ignition switch ‘ON’ before the oil is suppliedii) Delayed return to re-start position to allow purgingiii) Re-start after temporary electric supply failure iv) Positive safety lock-out in case of flame failure from whatever cause.v) Red signal light on control panel to indicate safety lock outvi) Photo electric protective cell as flame failure device.

Particular Spec for Incinerator

The burner shall have all the necessary controls e.g.Solenoid valves, ignition controls, photo electric cell fuel safety controls, low pressure fuel supply cut-off etc.Weight (kg), please indicate:Secondary ChamberGas Retention Time – 2 SecondsDiesel/LPG/LNG, please indicatePower Supply for Control Box- 220V-240V 50Hz single phaseBurn Rate 250kg/h minimumWeight (kg) please indicate:Secondary ChamberGas Retention Time 2 SecondsFuel Diesel/LPG/LNG, please indicatePower Supply for Control Box 220V-240V 50Hz single phaseMinimum operating temperature 920 °C, please indicate Lot 4 C High Temperature Waste IncineratorItem 13 HTW Incinerator model D Burn Rate – 150kg/hour minimum Weight (kg), please indicate: Secondary Chamber Gas Retention Time 2 Seconds Fuel Diesel/LPG/LNG, please indicate The incinerator shall operate in an automatic manner with all the necessary controls.  These controls are to include safety elements such as flame failure unit, pilot lamps, fuses, starters, overload contactors, ON and OFF switches for burners and fans, combustion chamber temperature indicators for primary and secondary chambers etc. i)  Electric ignition switch ‘ON’ before the oil is suppliedii) Delayed return to re-start position to allow purgingiii) Re-start after temporary electric supply failure iv) Positive safety lock-out in case of flame failure from whatever cause.v) Red signal light on control panel to indicate safety lock outvi) Photo electric protective cell as flame failure device.

TECHNICAL SPECIFICATIONS FOR THE INCINERATOR

1. SCOPE OF WORK The work specified in the contract will include. 1. Supply, install and commission an incinerator as provided in the technical specifications 2. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this tender. 3. Assessment and preparation and construction of a standard incinerator shed with one waste storage room ( see the design )  4. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and instructions.  5. Fuel oil storage tank- Mild steel1500 liters capacity  6. Onsite training for operation and maintenance staff.  auto on/off burner Auto temperature-excess air blower fanChamber constructed of two layer refractory lining, compressing:Thermal insulator lining & refractory masonry lining sufficient enough to maintain normal temperature at outsideControl PanelStandard PLC ControlNote: All the instruments/controllers must be of high quality. Preferably European/Japanese originChimnery/Stack-Made of MS Sheet. Sufficiently insulated & lined with refractory bricks(where required) to maintain normal temperature at outer surface-painted with high quality-customer will be responsible for provision of electric supply and natural gas uot in incineratorHeat and corrosion resistant paint.Note:Motors of all blowers/fans/pumps must be high quality, preferably imported(Japanese. European std)

TECHNICAL SPECIFICATIONS FOR THE INCINERATOR

1. SCOPE OF WORK The work specified in the contract will include. 1. Supply, install and commission an incinerator as provided in the technical specifications 2. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this tender. 3. Assessment and preparation and construction of a standard incinerator shed with one waste storage room ( see the design )  4. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and instructions.  5. Fuel oil storage tank- Mild steel1500 liters capacity  6. Onsite training for operation and maintenance staff.  auto on/off burner Auto temperature-excess air blower fanChamber constructed of two layer refractory lining, compressing:Thermal insulator lining & refractory masonry lining sufficient enough to maintain normal temperature at outsideControl PanelStandard PLC ControlNote: All the instruments/controllers must be of high quality. Preferably European/Japanese originChimnery/Stack-Made of MS Sheet. Sufficiently insulated & lined with refractory bricks(where required) to maintain normal temperature at outer surface-painted with high quality-customer will be responsible for provision of electric supply and natural gas uot in incineratorHeat and corrosion resistant paint.Note:Motors of all blowers/fans/pumps must be high quality, preferably imported(Japanese. European std)

WASTE INCINERATORS RECOMMENDATIONS

Incinerate minimum 80kg/hr X 12 hrs per dayDisposal of both non-hazardous and hazardous waste streams (per waste inventory)Mobile Unit (Skid mounted preference with lifting points)Design/SpecificationsIncinerators must have a secondary combustion chamber with a minimum temperature range of 900cLiquid waste streams shall be incinerated by an appropriate liquid injection systemThe incinerators will be installed with visual alarms to alert operations of low temperature in the secondary chamberOperating Environment and Ambient Conditions The Incinerators package shall be designed to operate under the following conditions:Average Daily Max/Min June Temperature, 21-39°CAverage Daily Max/Min January Temperature, 2-12°C

WASTE INCINERATORS RECOMMENDATIONS

Incinerate minimum 80kg/hr X 12 hrs per dayDisposal of both non-hazardous and hazardous waste streams (per waste inventory)Mobile Unit (Skid mounted preference with lifting points)Design/SpecificationsIncinerators must have a secondary combustion chamber with a minimum temperature range of 900cLiquid waste streams shall be incinerated by an appropriate liquid injection systemThe incinerators will be installed with visual alarms to alert operations of low temperature in the secondary chamberOperating Environment and Ambient Conditions The Incinerators package shall be designed to operate under the following conditions:Average Daily Max/Min June Temperature, 21-39°CAverage Daily Max/Min January Temperature, 2-12°C

Specifications Double chamber incinerator

Primary combustionDiesel/LPG/LNG burning primary combustion chamber/primary combustion zone Secondary combustionResidence time in the secondary chamber not less than 2 secondsBoth primary and the secondary temperatures maintained until all the waste has been completely combustedChimney Chimney with a minimum height of 4 meters above ground level Minimum exit velocity of the emissions not less than 10 metres/secondTemperature Warnings Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperatureGeneralControl box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height

Specifications Double chamber incinerator

Primary combustionDiesel/LPG/LNG burning primary combustion chamber/primary combustion zone Secondary combustionResidence time in the secondary chamber not less than 2 secondsBoth primary and the secondary temperatures maintained until all the waste has been completely combustedChimney Chimney with a minimum height of 4 meters above ground level Minimum exit velocity of the emissions not less than 10 metres/secondTemperature Warnings Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperatureGeneralControl box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height